Find Upp Petroleum, Double Wall Pipe, Gas Staion Pipe on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > HDPE Pipe > HDPE oil pipe > Upp Petroleum Filling Gas Station Conductive Double Wall Pipe

Upp Petroleum Filling Gas Station Conductive Double Wall Pipe

Product Description

Product Description of HDPE FLW buried pipeline
 

CHUANGRONG FLW buried pipeline system advantages:
 

1. Double protection,Zero penetration:FLW oil pipeline system eliminates the possibility of fuel Spills into the

environment, thus protecting the soil and water from pollution effectively.
 

2.Safe and efficient installation, Low cost:FLW oil pipeline welding uses intelligent welding machine which lets

double pipe connected completely. FLW oil pipeline system is without concrete trench and installation costs is

greatly reduced.
 

3.24 hours monitoring:FLW petroleum pipeline system has a leak detector, the pipeline for 24 hour monitoring.

Once leaked, Indoor monitoring system will alarm.
 

4.Collision,Puncture,Tensile,Anti-ground motion capability.

 
Specification of HDPE FLW buried pipeline
Upp Petroleum Filling Gas Station Conductive Double Wall Pipe
Product CodeDescription
FLW-54EC6OD54mm single layer pipe, 50m/Roll
FLW-63EC6OD63mm single layer pipe, 50m/Roll
FLW-65/54EC6Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
FLW-75/63EC6Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length

Upp Petroleum Filling Gas Station Conductive Double Wall Pipe

Product CodeDescription
FLW-54EC6OD54mm single layer pipe,5.8m/Length
FLW-63EC6OD63mm single layer pipe,5.8m/Length
FLW-90EC6OD90mm single layer pipe,5.8m/Length
FLW-110EC6OD110mm single layer pipe,5.8m/Length
FLW-65/54EC6Outer pipe with OD65mm,Inner pipe with OD54mm double layer pipe, 5.8m length
FLW-75/63EC6Outer pipe with OD75mm,Inner pipe with OD63mm double layer pipe, 5.8m length
FLW-125/110EC6Outer pipe with OD125mm,Inner pipe with OD110mm double layer pipe, 5.8m length
 
Certificate:ISO, CE,BV,SGS

Packing Method:Normal export packing.

Pipe dia.54mm-75/63mm can be in coils with 50m length;

Pipe dia. 54~125/110mm in bars with 5.8m length.

Production Lead Time:Depending on the order quantity.

Normally about 2 weeks days for 20ft container, 3·4 weeks for a 40ft container.

Supply Ability:100000 Ton/Year

Payment Method:T/T, L/C at sight,West Union

Trading Method:EXW, FOB, CFR, CIF,DDU
 

Application of HDPE FLW buried pipeline
Upp Petroleum Filling Gas Station Conductive Double Wall PipeUpp Petroleum Filling Gas Station Conductive Double Wall Pipe

Contact us if you need more details on Upp Petroleum. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Double Wall Pipe、Gas Staion Pipe. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : HDPE Pipe > HDPE oil pipe